/home/dh_bkddqn/completeutility.contractors/content.php (366): [2] Undefined variable $section_id
/home/dh_bkddqn/completeutility.contractors/content.php (472): [2] getimagesize(images/our-work/sewer-projects/City-of-Burnaby---Sewer-Separation-1632864009.jpg): Failed to open stream: No such file or directory
/home/dh_bkddqn/completeutility.contractors/content.php (473): [2] Trying to access array offset on value of type bool
/home/dh_bkddqn/completeutility.contractors/content.php (473): [2] Trying to access array offset on value of type bool
/home/dh_bkddqn/completeutility.contractors/content.php (472): [2] getimagesize(images/our-work/sewer-projects/City-of-Burnaby---Sewer-Separation-1632863897.jpg): Failed to open stream: No such file or directory
/home/dh_bkddqn/completeutility.contractors/content.php (473): [2] Trying to access array offset on value of type bool
/home/dh_bkddqn/completeutility.contractors/content.php (473): [2] Trying to access array offset on value of type bool
/home/dh_bkddqn/completeutility.contractors/content.php (472): [2] getimagesize(images/our-work/sewer-projects/City-of-Burnaby---Sewer-Separation-1632863550.jpg): Failed to open stream: No such file or directory
/home/dh_bkddqn/completeutility.contractors/content.php (473): [2] Trying to access array offset on value of type bool
/home/dh_bkddqn/completeutility.contractors/content.php (473): [2] Trying to access array offset on value of type bool
/home/dh_bkddqn/completeutility.contractors/content.php (472): [2] getimagesize(images/our-work/sewer-projects/City-of-Burnaby---Sewer-Separation-1632863525.jpg): Failed to open stream: No such file or directory
/home/dh_bkddqn/completeutility.contractors/content.php (473): [2] Trying to access array offset on value of type bool
/home/dh_bkddqn/completeutility.contractors/content.php (473): [2] Trying to access array offset on value of type bool
- Completion Date: August 2020
- Start Date: January 2020
- Client: City of Burnaby, Louise Huang, 604-294-7446
This package was available for pre-qualified contractors only. Complete Utility Contractors is in good standing with the City of Burnaby and is pre-qualified to work on projects of a similar nature. CUC has completed close to $20,000,000 of work for the City of Burnaby in the last 18 months. All works have been obtained through competitive bidding processes.
The work on this project took place in the north-west area of Burnaby with sections of the pipe extending to Hastings Road and the main dual trench trunk sewer was completed on Boundary Road. This project involved live connections to existing sanitary systems as well a live force mains.
Heavy equipment, 470 and 345 size excavators were used to complete the deep excavations, install and remove heavy shoring and accurately place approximately 30+ concrete manholes during the project. Traffic diversions and public interface were also a major component of which both were managed successfully. The final concrete and asphalt restorations completed shortly after and during mainline work. The project was delivered on time and on budget for the City of Burnaby.