Date Posted : June 30, 2021


Covered under these concrete work and paved pathways construction are 2,000 meters of Shaw and Telus ducts and various other utility infrastructure as listed below.



  • Completion Date: June 2021
  • Start Date: July 2020

The project's scope included supply, installation and commissioning of a sanitary pump station, installations of 460 meters of 200mm PVC watermain, 200 meters of 300mm PVC watermain, 500 meters of 200mm sanitary sewer, 300 meters of 450mm storm sewer, 2,400 meters of hydro ducts, 2,000 meters of Shaw and Telus ducts, 16 street lights, concrete curbing and pathways construction.

The site was finished with highway spec asphalt, decorative columns, concrete sidewalks and streetlighting.